Sobetracom

References

Six assignments, four countries

From emergency medical supplies to a 10 m press brake, every assignment starts from a precise need.

Pipes delivered in Burundi
Country
Sector

6 references shown

  • Pipes delivered in Burundi, stacked by the vegetation, with three people

    Burundi · pipes delivered on site

    Drinking water · Burundi

    Water supply project

    Country
    Burundi
    Client
    CASOBU, funded and supported by AMUDevelopment project
    Sector
    Water & infrastructure

    Assignment

    Supply of some 10 km of water pipes, with the fittings and tools required, for CASOBU. The project is funded and supported by AMU.

  • Boxes of defibrillators on a pallet in a warehouse

    Defibrillators on a pallet, before shipping

    Medical equipment · DR Congo

    Emergency medical supplies

    Country
    DR Congo
    Client
    Ministry of Public Health, Hygiene and Social WelfarePublic institution
    Sector
    Health

    Assignment

    Urgent supply of complete medical bags, first-aid kits and defibrillators, for the preparations of the Pope's visit to the Democratic Republic of the Congo.

  • Broadcast & IT · Guinea

    IT and broadcast equipment

    Country
    Guinea
    Client
    Broadcasting sectorTelevision and broadcasting
    Sector
    IT & broadcast

    Assignment

    Supply of IT hardware and professional audiovisual equipment for television and broadcasting.

  • Industrial tools · DR Congo

    Rehabilitation of a hydropower plant

    Country
    DR Congo
    Client
    ENABELBelgian development agency
    Sector
    Industry · energy

    Assignment

    Supply of industrial equipment and professional tools for the rehabilitation works of a hydropower plant in DR Congo.

  • A man rests his hand on a giant press brake in a workshop

    Long press brake

    Industrial equipment · Nigeria

    Industrial workshop equipment

    Country
    Nigeria
    Client
    Private companyPrivate sector
    Sector
    Industry

    Assignment

    Support in purchasing high-capacity industrial equipment: a press brake up to 10 metres, overhead cranes, a laser cutter and other machines to fit out workshops.

  • Measurement & analysis · DR Congo

    Analysis and measuring equipment

    Country
    DR Congo
    Client
    AFD-backed projectFrench Development Agency
    Sector
    Industry · measurement

    Assignment

    Supply of equipment for electrical and gas analysis and measurement, for a project backed by the French Development Agency.

They trusted us with an assignment

A project in Africa? Let's talk.

Tell us what you need and where it goes. We come back to you with first leads.